Footbridge
Paper, Order, or Assignment Requirements
Aims and objectives of the footbridge
The aim of this assignment is to produce elements of the technical design for the Charterhouse Field development project.
1. Preliminary calculations for the main structural elements of the footbridge and foundations.
2. Preliminary costing of main construction activities.
3. Consideration of construction site management.